Basic Package

Price: ₹ 2200/per sqft

Designs & Drawings

  • Building Plan
  • Structural Design

Structure

  • Steel - Kamatchi, Tirumala or equivalent
  • Cement - Dalmia, Zuari or equivalent
  • Blocks - Wire cut red bricks
  • RCC Design Mix - 1:1.5:3 ratio machine mix concrete
  • Ceiling Height - 10 feet (Finished Floor level to Finished Floor level)

Doors & Windows

  • Windows - UPVC Windows with glass shutters
  • Main Door - High quality teak Door of frame sixe 5”x4” of price Rs20,000
  • Internal Doors - Membrane doors /Flush Door with Laminates upto Rs.6,000 including fixtures of frame 3”x2.5”
  • Bathroom doors - PVC doors Rs3500

Painting

  • Interior Painting - 2 coats of Asian putty + 1 coat of asian primer + 2 coats of Asian Tractor quality paint
  • Exterior Painting - 1 coat white cement+1 coat of Asian damp proof + 2 coat of Asian Exterior emulsion Ace Paint
  • MS grill - 1 coat primer + 2 coat enamel paint

Kitchen

  • Interior Painting - 2 coats of Asian putty + 1 coat of asian primer + 2 coats of Asian Tractor quality paint
  • Exterior Painting - 1 coat white cement+1 coat of Asian damp proof + 2 coat of Asian Exterior emulsion Ace Paint
  • MS grill - 1 coat primer + 2 coat enamel paint

Bathroom

  • Ceramic Wall Dado upto 7' height - Upto Rs.45 per Sqft
  • Sanitarywares & CP fittings upto Rs.20,000 per bathroom of parryware or hindware make
  • CPVC Pipe - Ashirwad or equivalent

Flooring

  • Living & Dining Flooring - Tiles of value upto(4’x2’) Rs.55 per sqft
  • Rooms & Kitchen Flooring - Tiles of value upto Rs.55 per sqft
  • Balcony and Open Areas Flooring - Anti-skid tiles of value upto Rs.45 per sqft
  • Staircase Flooring - Granite flooring upto Rs.50 per sqft
  • Parking Tiles - Anti-skid or vitrified tiles of value upto ₹ 50 per sqft

Electrical

  • Wires - Fireproof wires by orbit or kundan
  • Switches & Sockets - Orbit or GM or equivalent
  • UPS wiring provision
  • EV charging point on parking

Complimentary

  • Overhead Tank (1000 litres) Worth 7500
  • Rain water harvesting with choke pit

Extra Work (Additional Costs)

  • Drawing & Approval
  • Elevation 3D and Elevation
  • Lift
  • Sump
  • Septic Tank
  • OHT
  • Compound Wall
  • Main Gate Additional
  • Safety Gate and Ladder Additional
  • Bore Well
  • Weathering Tiles
  • E.B. Connection
  • Electrical Fittings
  • Interior
  • Parapet Wall 9’’
  • Chokepits, Drainage, Metro Water, etc.
  • Water Purchase From Outside
  • Setback Area Filling and Floor Finishing
  • Soil Testing